Unit Learning Outcomes

1

Know the tools and equipment used for cutting and jointing plastic soil and waste pipe.

Plumbing tools for waste pipework

  • pencil
  • mitre box
  • panel saw
  • plastic pipe cutters
  • cordless drill and bit, rawplugs
  • screwdriver bit

Assessment Criteria

  • 1.1

    Identify the plumbing hand tools used for cutting and jointing plastic soil and waste pipe.


2

Know the different fittings and sizes of plastic soil and waste pipe used in basic plumbing systems.

Material specifications and use

  • soil and vent pip 100 mm dia, 160mm dia
  • waste pipework 32mm 40mm ,
  • 21.5mm for overflows
  • pipe lengths 3m,
  • soil and vent pip 100 mm dia, 160mm dia
  • waste pipework 32mm 40mm , 21.5mm for overflows
  • pipe lengths 3m, 6m

Waste pipework fittings

  • type of fitting, push fit, solvent welded, mechanical fixing
  • traps, s or p type
  • straight, bend, specialist pipe connectors
  • svp branch connectors
  • pipe clips and screws

Waste pipework installation

  • volumes of waste water from fitting
  • type of trap required
  • fall required to pipe
  • planning route
  • sizing pipework
  • measuring lengths required
  • cutting pipework
  • installation and jointing
  • testing for any faults

Assessment Criteria

  • 2.1

    State typical pipe diameters and their use for soil and waste pipes.

  • 2.2

    Identify the following fittings

    a) push-fit

    b) solvent weld

    c) mechanical

  • 2.3

    State typical sizes and uses for the following fittings

    a) push-fit

    b) solvent weld

    c) mechanical

  • 2.4

    Describe installation procedures for waste pipework.


3

Be able to carry out a plumbing waste installation using plastic soil and waste pipe.

Demonstrate waste pipework installation

  • measure sink waste outlet
  • plan material quantities required
  • cutting of pipework
  • fixing pipe brackets
  • jointing of pipework
  • installation of sink trap
  • final connections to soil stack
  • testing the installation

Assessment Criteria

  • 3.1

    Estimate the materials required for a waste connection from a sink unit to a soil stack.

  • 3.2

    Measure and cut waste pipework to size.

  • 3.3

    Carry out basic plumbing tasks using waste fittings and pipework.

  • 3.4

    Test the completed waste pipework installation for water tightness.