Overview
- Framework:
- RQF
- Level:
- Entry Level 3
- Unit No:
- M/618/3330
- Credits:
- 3
- Guided learning hours:
- 30 hours
Know the resources required to produce plastic pipework.
Plumbing hand tools and materials
Identify plumbing hand tools.
Identify how to cut plastic supply and waste pipe correctly.
Identify plastic push fit fittings and pipe inserts.
Be able to produce plastic supply pipework.
Safe installation practices for water services
Use safe working practices to
a) form bends using push-fit settings
b) form tee joints in push-fit settings
Disassemble push fit fittings.
Be able to produce plastic waste pipework.
Safe installation practices for foul waste installation
Use safe working practices to
a) form bends using push-fit settings
b) Form tee joints in plastic waste systems
Connect a trap to a sink and the waste pipe.